Doc. 02 / Template

Pillar
Predictable Customers
Format
Template
Reading time
2 min read

Pipeline stage definitions and exit criteria

A one-page worksheet for defining your pipeline so two people looking at the same job agree on where it sits.

01Section

How to use this worksheet

Work through it once with whoever answers the phone and whoever prices the work. It should take under an hour. The goal is not a perfect process — it is a shared definition that removes the argument about whether a job is 'in the pipeline'.

  1. 01Name your stages. Five is right for most field service companies. Never more than six.
  2. 02For each stage, write the single observable event that lets a job enter it.
  3. 03For each stage, write the exit criteria — what must exist before the job moves forward.
  4. 04Assign one named owner per stage.
  5. 05Set a maximum age in days. Anything older gets raised at the weekly meeting.

02Section

The worksheet

FieldYour answer
Stage name________________
Enters when________________
Exit criteria (evidence required)________________
Owner (name)________________
Maximum age (days)________________
Where it is recorded________________
What triggers the next step________________

Copy the block above once per stage. Keep the whole thing to one page.

03Section

Worked example — tree care

StageExit criteriaOwnerMax age
InquiryName, address, tree count, and access constraint recordedOffice coordinator1 day
QualifiedConfirmed in service area, work type we perform, and permit need identifiedOffice coordinator2 days
Site visitPhotos, height and drop zone notes, equipment requiredEstimator3 days
ProposalPriced scope sent and client confirmed receiptEstimator5 days
SignedSignature, deposit, and a start window on the scheduleOwner

04Section

Common mistakes

  • Stages named after feelings — 'warm', 'hot', 'thinking about it'. Use events.
  • No maximum age, so quiet deals live forever and inflate the pipeline.
  • Two owners on a stage, which means no owner.
  • Exit criteria that cannot be checked without asking the owner.
  • Recording jobs in three places at once. Pick one system, even if it is a spreadsheet.

Do this first

One page, five stages, one named owner each, one maximum age each. Print it and put it where the phone gets answered.

IK Systems · Build a business you can predict

02 / 06

Start here

How structurally ready is your business for its next stage?

The Business Predictability Assessment scores your customer, operational, and execution structures in one to three minutes, and shows you which one is holding the other two back.